Summary
This article walks you through the process of adding the PM Surya Ghar: Muft Bijli Yojana Incentive in your proposals.
PM Surya Ghar: Muft Bijli Yojana is a flagship initiative launched by the Government of India in 2024 to provide up to 300 units of free electricity each month to 1 crore households through rooftop solar installations. The scheme offers direct subsidies for solar installations, promotes clean energy, and aims to reduce electricity costs and carbon emissions.
What's new
You no longer need to set up the PM Surya Ghar: Muft Bijli Yojana incentive yourself. Every OpenSolar org in India now has it already created, with the national residential subsidy amounts filled in:
| System size (DC) | Subsidy |
|---|---|
| Up to 2 kW | ₹30,000 per kW |
| 3rd kW (2–3 kW) | ₹18,000 |
| Above 3 kW | No additional amount |
| Maximum (cap) | ₹78,000 |
You'll find it in Control > Other > Incentives. This applies to new orgs as they sign up and to all existing India orgs.
The incentive is not added to your projects automatically
The incentive is ready in your account, but OpenSolar does not add it to projects for you. You choose which projects get it.
We made it this way because whether a homeowner actually receives the subsidy depends on things OpenSolar can't see from the project, such as:
- System size and sanctioned load. The subsidy is for residential systems up to 10 kW (and not above the home's sanctioned load). Above 10 kW the homeowner receives nothing, but the incentive would still show ₹78,000 if you applied it.
- ALMM-listed modules. The scheme requires modules from the government's Approved List of Models and Manufacturers (ALMM). OpenSolar shows a warning in Design if a module isn't on the list.
- Who owns the system. Housing societies and RWAs (GHS/RWA) are covered by a different subsidy, not this one.
Showing a homeowner ₹78,000 they won't receive is worse than one extra click, so you decide when it applies.
How to add the incentive to a project
- Open the project and go to the Design tab.
- In the left-hand menu, click Incentives.
- Click Override Default Incentives to see the full list of incentives in your account.
- Tick PM Surya Ghar: Muft Bijli Yojana.
- Click Save in the top-right corner.
The subsidy now appears on the proposal and quotation, and the customer sees the Net System Cost after subsidy. The subsidy is shown as an amount the customer claims, so it doesn't reduce your contract price or payment milestones.
Tip: Before you add it, check that the system is residential, 10 kW or smaller, and uses ALMM-listed modules.
Creating your own incentive
The pre-created incentive covers the national residential subsidy. You can still create your own incentives alongside it, for example:
- a state top-up subsidy offered on top of PM Surya Ghar in your state
- a GHS/RWA society subsidy for common-facility systems in housing societies
- a company discount or offer you want shown as an incentive
To create one, follow the steps :
- Go to Control > Other > Incentives
- Click Add New Incentive.
- Select Size Based Incentive as the Incentive Type.
- Select PV System DC Capacity (kW) as the Size Based Incentive Type.
- Toggle on Scale Incentive Value by System Size / Capacity. This is where you define the value per unit depending on the size/capacity of the system. To do so, set the following:
| Size/Capacity Tier (kW) | Value per Unit (₹) |
| 0 | 30,000 |
| 2 | 18,000 |
| 3 | 0 |
- Set the Cap Amount to ₹78,000.
- Click Save.
You can also edit the pre-created PM Surya Ghar incentive if the amounts change.
Frequently asked questions
I already set up PM Surya Ghar myself. Will I have two? No. If your org already had the incentive, we didn't create a second one.
My PM Surya Ghar incentive used to apply to new projects automatically, and now it doesn't. Why? As part of this change, automatic applying was turned off for the PM Surya Ghar incentive in all India orgs, for the eligibility reasons above. Add it to each eligible project using the steps above.
What happens to projects that already have the incentive? Nothing. Projects that already had PM Surya Ghar applied keep it, and their pricing doesn't change.
The incentive doesn't show on an older project. What do I do? Add it from Design > Incentives as described above. If the price still looks wrong, recalculate the project's pricing to refresh it.