This article relates to the Project zone > Design tab of the app.
From time to time, you might make a change in the control zone, and not see this change reflected in a proposal you had been working on. That is because a system recalculation is required to factor in this change.
For example, if you have changed any of the items below in control after designing your system, it will not factor into a proposal that has already been created.
- Pricing Schemes
- Any updates in Project Configuration (including cost build-up, financial simulation, setbacks etc)
- Payment Options
- Equipment
- Incentives
To recalculate your system, go to to the Design tab of the project, click at the top right corner, then select "Recalculate" at the bottom. This will factor in any recent changes you have made.
On the other hand, there are changes that will factor into the proposal immediately. These are:
- Proposal Template
- Team/Org details